Strip outs & dilapidations

Office strip outback to shell, ready for handover

An office strip out removes everything that was added to a space during your lease, such as partitions, carpet tiles, cabling and fitted furniture, so you can hand it back to the landlord. We combine the strip out with the furniture, IT and paper clearance, so it is one programme and one contractor.

Why businesses choose us

Licensed waste carrier
DBS-checked crews
Full audit trail
Reuse first, zero landfill
Office floor stripped back to shell after partitions and carpet tiles were removed
0%
Waste to Landfill
Typical use
Lease end, refit
Includes
Partitions, floors, cabling
Plus
Furniture, IT, paper
Paperwork
WTNs + certificates
01.

Strip out or clearance: which do you need?

A clearance removes loose items: furniture, equipment and waste. A strip out goes further and removes things fixed to the building that you or a previous tenant installed. If your lease has a reinstatement clause, the dilapidations schedule will usually list what needs to come out. Read it before booking, as it decides the scope and the price.

02.

What a strip out can include

Depending on your schedule, we can remove:

  • Demountable and stud partitions, glazed meeting rooms and doors
  • Carpet tiles and raised access floor coverings
  • Data and power cabling, floor boxes and comms cabinets
  • Kitchenettes, fitted storage and reception counters
  • Signage, blinds and wall-mounted screens
03.

Recycling the materials

Strip outs create mixed waste, but most of it is recyclable if it is separated as it comes out. Plasterboard is kept apart from general waste, metal stud and frames go to metal recycling, carpet tiles are sent for reuse or recycling where possible, and copper cabling is recovered. We record where each stream goes so you have it for your ESG reporting.

04.

Timing against your lease end

Strip outs usually need to finish before the landlord's final inspection, with time for any making good. We plan backwards from that date: clearance of furniture, IT and paper first, then strip out, then a final sweep. For a typical single floor, allow one to two weeks for the strip out itself, and book early in the last quarter of a lease when demand is highest.

05.

What to check before a strip out starts

A few checks before work begins avoid delays and extra cost later. Most of them sit with you or your landlord, and we will ask for them at the survey.

  • The dilapidations schedule or reinstatement clause, so the scope is agreed in writing
  • The building's asbestos register. Under the Control of Asbestos Regulations 2012, anyone disturbing the fabric of a non-domestic building built before 2000 must know whether asbestos is present
  • Which partitions or floors are landlord's original fit-out and must stay
  • Whether power and data need isolating by your electrician or IT provider first
  • Building rules for noise, working hours and use of goods lifts
06.

How a strip out is priced

Strip out pricing depends mainly on the floor area, what is being removed, and how much of it can be recycled rather than treated as mixed waste. Partitions with glazing and doors take longer than plain stud walls, and raised floors or large volumes of cabling add labour. Access and working hours matter too: night or weekend working in a busy building costs more than daytime work in an empty one.

We price strip outs from a site survey and the dilapidations schedule, and break the quote down by clearance and strip out so you can compare it with any figure your surveyor has given. Recovered metal and cable can reduce the cost, and we show this on the quote where it applies.

Once the work is finished, we can walk the space with you or your surveyor before the landlord's inspection, so anything missed can be dealt with while the crew is still on site.

One visit, three streams, one audit trail

One contract covers it all
01.

Furniture

Reused where possible, then separated by material for recycling.

02.

IT equipment

Data wiped or destroyed via Premier IT Disposal, logged by serial number.

03.

Confidential paper

Shredded to BS EN 15713 by Premier Shredding, with a certificate.

Accredited & compliant

Certified to the standards that matter.

  • Upper tier waste carrier licence CBDU292540
  • £10m public liability insurance
  • Full chain of custody documentation
  • ESG and diversion reporting on request
ISO 14001ISO 27001BS EN 15713ISO 9001
Common questions

Your questions, answered.

Still unsure? Call 0800 121 4020 and speak to the team that does the work.

Who is responsible for the asbestos survey before a strip out?

The building owner or whoever manages the premises holds the duty to manage asbestos. Ask your landlord or managing agent for the asbestos register before we start, and we will plan the work around it.

Do I need a strip out if my lease is ending?

Only if your lease asks you to reinstate the space. Your dilapidations schedule will list what needs removing.

Can you do the strip out and clearance together?

Yes. We clear furniture, IT and paper first, then strip out, all as one programme with one set of paperwork.

Free, no obligation

Get a fixed quote.

Send photos or book a free survey. Written quote back within 24 hours.

  • Licensed waste carrier
  • DBS-checked crews
  • Full audit trail
  • Reuse first, zero landfill